Skip to content
Pouring concrete since 2017 (708) 934-9471
Summit Concrete Contractor logo
Blue house with a front walkway and steps to the porch

Front walks and gate paths

Summit Concrete Walkways and Sidewalks

A path to your door that feels solid underfoot and stays clear of puddles and ice.

The First Thing Guests See Should Be Done Right

Your front walk is the handshake of the house. Every guest, delivery driver and neighbor steps on it, and when one panel has lifted above the next or a low spot by the door turns into an ice rink each winter, it sours the whole first impression. On the older blocks around Summit we see a lot of original walks that were laid on bare clay long ago and have been shifting ever since. Our crew replaces them the way they should have been built to begin with. We jackhammer the tired panels and cart the pieces off in the truck. The path is excavated and filled with crushed stone, packed tight so every panel has the same support. Forms are staked with a slight sideways tilt, small enough that you will never feel it walking but enough to throw rain and meltwater off onto the grass. Most walks are poured about 4 inches thick, a little heavier where they cross a driveway or carry wheeled bins. The surface gets a light broom for traction, the edges are tooled smooth, and control joints are placed at even spacing so the finished walk looks crisp from the street.

What Our Crew Does on a Walkway Job

Short gate path or a long run of sidewalk, these steps are part of the work.

  • Breaking out the old walk

    Lifted, sunken or crumbling panels removed and hauled away.

  • Excavation and packed stone

    The path dug down and filled with compacted crushed stone.

  • A gentle sideways tilt

    Water sent off to the grass so ice does not form on the path.

  • Thickness for the traffic

    About 4 inches for feet, more where cars or bins cross.

  • Crisp joints and edges

    Even joint spacing and tooled edges for a clean look from the street to the door.

  • Lawn restored at the sides

    Soil worked back along both edges, ready for seed or sod.

How a New Walk Takes Shape

  1. Walk the route with you

    We look at the path, the low spots, tree roots and how it meets the door and drive, then write up a price.

  2. Clear and prepare

    Old concrete comes out, the path is dug and the stone base is packed. Forms go in with the tilt built in.

  3. Pour and finish

    Concrete placed, floated, broomed and jointed, then forms are pulled and the edges cleaned up.

Why Our Walks Stay Smooth for Years

  • Stone under every panel

    Even support means panels stay level with their neighbors.

  • Water steered aside

    The built-in tilt keeps the path clear of standing water and ice.

  • Finished with pride

    Straight lines, even joints and clean edges that make the house look cared for.

  • Old panels hauled away
  • Packed stone base
  • Tilt for drainage
  • Broom texture for grip

Ready to Retire That Uneven Front Walk?

Give us the rough length and what bugs you about it, and our crew lead will explain the rebuild and the cost.